PHOSPHATE QUAY

The Maritime Office in Szczecin determines, based on a survey dated 29.04.2024 –
a survey plan No. 095/2024-E, the permissible draught of vessels moored at the Phosphate quay in the Port of Szczecin:

1) at the Phosphate quay:

  • first 45 meters from the north side – shore reinforcement;
  • next 182 meters of quay – 5.8 meters;
  • next 50 meters of the quay – 5.4 meters;
  • remaining 14 meters of the quay – 4.2 meters.

2) on the approach to the Phosphate quay – 5.7 meters.

The above determination of ship drafts is referenced to the PL-EVRF-2007-NH elevation system and is valid for 12 months from the date of the survey.
In order to relate the established permissible draught of ships to the average water level 515 in the Port of Szczecin, 0.2 meters should be added to the above values.

DOLPHIN QUAY

The Maritime Office in Szczecin establishes, on the basis of the survey dated 29.04.2024 – sounding plan No. 096/2024-E, the permissible draught of vessels moored at the dolphin station of the Phosphate quay in the Port of Szczecin:

At the central berth on a mooring line of 185 meters (65 meters of the central berth and 60 meters each to the north and south on the extension of the central berth’s dolphins):

  • 5.7 meters – along the entire length of the mooring line.
  • On the approach to the dolphin station – 5.7 meters.

Note: when determining the draught of ships moored at the dolphin station, distance fenders were taken into account.
The above determination of ship drafts is referenced to the PL-EVRF-2007-NH elevation system and is valid for 12 months from the date of the survey.
In order to relate the established permissible draught of ships to the average water level 515 in the Port of Szczecin, 0.2 meters should be added to the above values.